How to read a building quote
Two quotes for the same job can differ by thousands without either one being wrong, because they are not pricing the same thing. This is how to compare them fairly.
Why a phone price is a guess
Ground conditions, the roof junction, drainage, access and the age of the existing structure all move the cost. None of that is visible on a call or from a handful of photos, which is why we visit before we quote.
What a written quote should contain
A description of the work, what materials are included, how long it should take, a payment schedule tied to stages and the VAT position. If it is a single figure with nothing behind it, ask for a breakdown before you agree anything.
The exclusions that matter
Decorating, floor finishes, landscaping repairs, skips and the cost of drawings or Building Regulations fees are commonly left out. Check each one, because they add up, and ask for provisional sums to be shown as such.
Why the number sometimes changes
On an older house, opening up a wall or floor can reveal rot, an old drain or weak lintels. A good builder tells you at once and agrees the change before doing it. A bad one lets it appear on the final invoice.
What we do
Every project starts with a free site visit, so the quote that follows is based on what we have seen. If something changes once work is underway, you hear about it and agree it first.
Free site visit and quote
Tell us about the project at hello@canterburybuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.